Apparatus and method for processing wood fibers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11982054
APP PUB NO 20230228034A1
SERIAL NO

17892253

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A refining member including a refining body with a refining surface including first and second refiner bars separated by first and second refiner grooves. The first and second refiner bars extend from respective first and second radially inward positions to respective first and second radially outward positions. The first and second refiner bars have a respective first and second height extending upward from a floor of a respective, adjacent first or second refiner groove. The second height is a minimum height of the second refiner bars and is spaced apart from the second radially inward position, with the second height being at least about 0.35 mm less than the first height. The first refiner bars are adapted to refine wood fibers and the second refiner bars are adapted to break up fiber bundles.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL PAPER COMPANY6400 POPLAR AVE MEMPHIS TN 38197

International Classification(s)

loading....
  • 2022 Application Filing Year
  • D21D Class
  • 38 Applications Filed
  • 13 Patents Issued To-Date
  • 34.22 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Dwight Edward Cincinnati, US 10 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • D21D Class
  • 0 % this patent is cited more than
  • 1 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges9000.511.522.533.544.555.566.577.588.599.5

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2035