Total station with compensation for misaligned optical aiming point

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12123717
APP PUB NO 20230221118A1
SERIAL NO

17570922

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A total station includes a telescope, an EDM unit, and an onboard computer. The telescope is manually adjusted by a user to cause a target to be set at last partially within an FOV of the EDM unit. After the manual adjustment, an optical aiming point associated with the telescope is misaligned from a center point of the target by an offset angle. A user input indicating that the manual adjustment has been performed is received via a user interface. In response to the user input, a slope distance is measured using the EDM unit and an angle associated with the optical aiming point is measured. The offset angle is computed based on the slope distance, and an angle associated with the center point of the target is computed based on the angle associated with the optical aiming point and the offset angle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRIMBLE INC10368 WESTMOOR DRIVE WESTMINSTER CO 80021

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Johnston, Wayne Broomfield, US 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00