Creeper with wire frame
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Oct 8, 2024
Grant Date -
Jul 13, 2023
app pub date -
Jan 10, 2022
filing date -
Jan 10, 2022
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A creeper frame comprising: a first and second side-rail; and a plurality of cross-rails located between the first and second side-rail. The first and second side-rails each include two side-rail wires secured together by a plurality of side-rail wire clips, and each cross-rail of the plurality of cross-rails includes two cross-rail wires secured together by a cross-rail wire clip.
First Claim
all claims..Other Claims data not available
Family
- No Family data available.
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
WHITESIDE MFG CO | 309 HAYES STREET DELAWARE OH 43015 |
International Classification(s)

- 2022 Application Filing Year
- B25H Class
- 175 Applications Filed
- 80 Patents Issued To-Date
- 45.72 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Obitts, Shane | Elyria, US | 106 | 1481 |
# of filed Patents : 106 Total Citations : 1481 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B25H Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Apr 8, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Apr 8, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Apr 8, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
