Viewing angle switchable display device including integrated lens
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Apr 2, 2024
Grant Date -
Jul 6, 2023
app pub date -
Nov 30, 2022
filing date -
Dec 30, 2021
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A viewing angle switchable display device includes: a substrate having at least one subpixel; a plurality of transistors in the at least one subpixel on the substrate; first and second light emitting diodes in the at least one subpixel on the substrate, the first and second light emitting diodes connected to two, respectively, of the plurality of transistors; and an integrated lens on the first and second light emitting diodes, the integrated lens including a half cylindrical lens corresponding to the first light emitting diode and a half spherical lens corresponding to the second light emitting diode.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
LG DISPLAY CO LTD | SEOUL |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Song, Tae-Joon | Paju-si, KR | 18 | 90 |
# of filed Patents : 18 Total Citations : 90 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- G09G Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Oct 2, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Oct 2, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Oct 2, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
