Method and system for manufacturing an aerostat with a rigid structure, and heavy-load-carrying aerostat manufactured in this way

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11981414
APP PUB NO 20230211866A1
SERIAL NO

17597684

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for erecting the structure of an aerostat in successive horizontal sections, starting from the top horizontal section, including an iteration of the following steps, starting from a current state of completion of the aerostat structure, lifting the current state of the structure, at first lifting points, by means of lifting means arranged in a current transverse position; placing a support device in line with second lifting points for lifting the current state of the structure; transferring the current state of the structure from the lifting means to the support device; moving the lifting means to another transverse position; completely assembling the horizontal section immediately below the current state of the structure on the structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FLYING WHALES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barthe, Clément Suresnes, FR 2 2
Crespin, Emmanuel Suresnes, FR 2 2
Gourlin, Jean-Marie Suresnes, FR 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00