Coal-air synchronous dynamic coordinated control method for coal-fired unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11822316
APP PUB NO 20230185282A1
SERIAL NO

18090580

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coal-air synchronous dynamic coordinated control method for a coal-fired unit is provided, comprising: determining functional relationship between unit loads and designed coal feed rates and functional relationship between unit loads and flue gas operation wet-basis oxygen contents, respectively; obtaining a theoretical wet flue gas volume and a combustion-supporting dry air volume per unit mass of burning coal, and calculating an actual combustion-supporting dry air volume per unit mass of burning coal; calculating an actual low calorific value of feed coal; calculating a combustion-supporting dry air volume and an outlet wet flue gas volume; according to the target value of load instruction at a future time point, calculating a coal feed rate variation and a combustion-supporting dry air volume variation; obtaining an operation wet-basis oxygen content variation; and obtaining target values of the coal feed rate and the operation wet-basis oxygen content to be adjusted.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUZHOU TPRI ENER & ENVIRO TECH CO LTDNO 8 PEIYUAN STREET NEW DISTRICT SUZHOU JIANGSU 215153 215153

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
He, Jinliang Jiangsu, CN 17 4
Jin, Lipeng Jiangsu, CN 1 0
Mei, Zhenfeng Jiangsu, CN 3 0
Song, Yubao Jiangsu, CN 3 1
Yang, Wanrong Jiangsu, CN 1 0
Zhao, Min Jiangsu, CN 107 987
Zhu, Canghai Jiangsu, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00