Air Barrier Material Application Systems And Methods
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
May 25, 2023
app pub date -
Jan 9, 2023
filing date -
Jan 30, 2017
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A post-cure inflation machine for processing a tire may include a tire holder shaft. The tire holder shaft may include a chuck to secure the tire to the tire holder shaft. A hollow passage may be defined in the tire holder shaft. A spray nozzle may be connected to a spray shaft that is telescopically disposed in the hollow passage of the tire holder shaft. The spray nozzle may extend to spray an air barrier material onto the tire.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
BRIDGESTONE AMERICA TIRE OPERATIONS LLC | 200 4TH AVENUE SOUTH NASHVILLE TN 37201 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Deering, Joseph D | Hendersonville, US | 4 | 0 |
# of filed Patents : 4 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B05D Class
- 0 % this patent is cited more than
- 2 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Nov 25, 2026 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Nov 25, 2030 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Nov 25, 2034 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
