Method for calibrating daily precipitation forecast by using bernoulli-Gamma-Gaussian distribution

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12105250
APP PUB NO 20230152488A1
SERIAL NO

17793050

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a method for calibrating daily precipitation forecast by using a Bernoulli-Gamma-Gaussian distribution, including the following steps: acquiring daily raw forecast data and observed data; using a Bernoulli distribution to perform precipitation occurrence analysis; using a Gamma distribution to perform precipitation amount analysis on the data that precipitation occurs; using a Gaussian distribution to perform normal transformation on the raw forecast data and the observed data according to the analysis results of the Bernoulli distribution and the Gamma distribution, and obtaining corresponding normalized variables; constructing a bivariate joint normal distribution; constructing a conditional probability distribution of a predictand; and determining whether a forecast to be calibrated is that a precipitation event occurs, determining a conditional probability distribution parameter of the predictand, then randomly sampling the conditional probability distribution of the predictand, and finally obtaining the calibrated forecast by means of inverse normal quantile transform.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUN YAT-SEN UNIVERSITY510275 NO 135 WEST XINGANG ROAD GUANGZHOU GUANGDONG HAIZHUQU DISTRICT GUANGZHOU CITY GUANGDONG PROVINCE 510275

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Zeqing Guangdong, CN 2 0
Zhao, Tongtiegang Guangdong, CN 6 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00