Toothed belt

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11719309
APP PUB NO 20230141466A1
SERIAL NO

18090338

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transmission system using a toothed belt includes a belt body made of elastomer and a core wire made of carbon fiber and provided so as to be embedded in the belt body and form a helix having a pitch in a belt width direction. The belt body includes a flat band portion having a horizontally long rectangular cross section and a plurality of tooth portions integrally provided on an inner peripheral side of the flat band portion. A belt tension T0.2 per belt width of 1 mm when a belt elongation rate is 0.2% is 70 N/mm or more, an amount of backlash between the toothed belt and a toothed pulley is 0.10 mm or more and less than 0.65 mm, a hardness of the belt body is 89° or more in JIS K 6253 Durometer Type A, and a surface dynamic friction coefficient is 1.5 or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BANDO CHEMICAL INDUSTRIES LTDKOBE CITY JAPAN'S HYOGO CENTRAL SOUTH ISLAND TOWN 4 CHOME 6 NO 6 KOBE-SHI HYOGO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsubakino, Kazuyuki Kobe, JP 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 8, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00