Combined power plant and method for operating combined power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11965434
APP PUB NO 20230131286A1
SERIAL NO

17578990

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combined power plant is provided. The combined power plant includes a gas turbine configured to combust fuel to generate a rotating force, a boiler configured to heat water to generate steam, an ammonia decomposition apparatus configured to receive a combustion gas generated in the gas turbine to thermally decompose ammonia to generate a decomposed gas containing hydrogen, nitrogen, and a residual ammonia, a steam turbine configured to generate a rotating force using the steam generated in the boiler, and a decomposed gas supply line configured to supply the decomposed gas generated in the ammonia decomposition apparatus to a combustor of the gas turbine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTD22 DOOSANVOLVO-RO SEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51711

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cha, Song Hun Osan, KR 15 31
Jang, Gwang Soo Changwon, KR 1 0
Kang, Hyun Hu Changwon, KR 1 0
Kang, Sung Gju Changwon, KR 8 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00