Two-stage combustor for thermophotovoltaic generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11722092
APP PUB NO 20230124247A1
SERIAL NO

18080923

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thermophotovoltaic generator incorporating a two-stage combustor for providing heat to a thermophotovoltaic cell. Combustor parts include a partial oxidation reactor, which functions catalytically to convert a hydrocarbon fuel and a first supply of an oxidant into a gaseous partial oxidation product; and further include downstream thereof, a deep oxidation reactor including a premixer plenum fluidly connected to a heat spreader comprising a porous matrix, such as a ceramic foam. Functionally, the deep oxidation reactor converts the gaseous partial oxidation product and a second supply of oxidant into complete combustion products. Heat produced by the two-stage combustor generates radiative energy from a photon emitter, which is directly converted to electricity in a photovoltaic diode cell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRECISION COMBUSTION INC410 SACKETT POINT ROAD NORTH HAVEN CT 06473

International Classification(s)

  • No Non-US Classification to display

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Crowder, Bruce Hamden, US 17 87
Macri, Francesco Farmington, US 9 10
Mastanduno, Richard Milford, US 22 118
Roychoudhury, Subir Madison, US 61 536

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • No Patent Citation Ranking to display

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 8, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00