Power source system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11752875
APP PUB NO 20230104493A1
SERIAL NO

18064038

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power source system includes a first power source, a second power source, a Direct Current to Direct Current converter, a first load including a vehicle control device configured to perform predetermined control regarding at least one of traveling, steering, and braking of the vehicle regardless of a driving operation performed by a driver of the vehicle, and an electric actuator as a control target of the vehicle control device, and connected to the first path so as to be supplied with power from the first power source, and a power source control device configured to control an operation of the Direct Current to Direct Current converter such that power is supplied to the first path from the second power source in a case where the predetermined control is performed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHAAICHI-KEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakayama, Shu Toyota, JP 7 40
Terada, Yasuharu Toyota, JP 39 424
Usami, Tomohiro Toyota, JP 21 146
Yoneyama, Isao Toyota, JP 17 147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00