Multi-phase voltage regulator control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11747840
APP PUB NO 20230058132A1
SERIAL NO

17893717

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system for a multi-phase power system includes a first phase line, a second phase line, and a third phase line. The control system includes a plurality of regulator controls including a first regulator control configured to control a first tap changer associated with the first phase line, a second regulator control configured to control a second tap changer associated with the second phase line, a third regulator control configured to control a third tap changer associated with the third phase line, and an electronic processor coupled to the first regulator control, the second regulator control, and the third regulator control. The electronic processor is configured to regulate the voltage of the multi-phase system using the first, second, and third regulator controls.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUBBELL INCORPORATED40 WATERVIEW DRIVE SHELTON CT 06484

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bach, Lawrence Deward St. Petersburg, US 4 0
Li, Thaichong Oldsmar, US 4 7
Manda, Ravi Palm Harbor, US 3 0
Tu, Hung Van Largo, US 5 3
Wulff, James Robert Clearwater, US 3 0
Yalla, Murty Largo, US 6 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00