Methods and systems for district energy CO2 support

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11965659
APP PUB NO 20230039702A1
SERIAL NO

17791808

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention concerns a district energy system comprising: —at least one cogeneration or heat pump unit —a first pipe system for district heating and/or cooling consisting of at least one liquid or vapor CO2 pipe; characterized by the fact that is also comprises a second pipe system consisting of at least one fluid line for the transport of CO2 or O2. The invention also relates to the use of a district energy system comprising: —at least one cogeneration or heat pump unit, —a first pipe system, —a second pipe system; characterized by the fact that that liquid or vapor CO2 is used in the first pipe system for district heating and/or cooling and that a fluid of CO2 or O2 is used in the second pipe system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXERGOAVENUE DES SPORTS 26 YVERDON-LES-BAINS 1400

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Favrat, Daniel Epalinges, CH 6 178
Mian, Alberto Birmensdorf, CH 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00