Assembled visual machete

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12103192
APP PUB NO 20220410416A1
SERIAL NO

17897224

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure discloses an assembled visual machete, including a first machete body and a second machete body; the first machete body and the second machete body are integrally assembled through a detachable bridging part; light emitting diode (LED) light strips are arranged on the first machete body and the second machete body; a control board and a battery are arranged in the bridging part; and the battery and the LED light strips are electrically connected to the control board. Therefore, when it is necessary to package and transport the entire assembled visual machete, the first machete body and the second machete body at both ends of the bridging part can be directly removed, and the bridging part, the first machete body and the second machete body in a detached state are placed in a package.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHANGSHA MOBILE ELECTRONIC TECHNOLOGY CO LTDNO 903 BUILDING 4 MODERN TRADE CITY NO 258 MAWANGDUI S RD GAOQIAO ST YUHUA DISTRICT CHANGSHA CITY HUNAN 410000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Hui Changsha, CN 333 1675

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00