Thermally-conductive structural adhesive for new energy power battery and method of preparing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11949081
APP PUB NO 20220393264A1
SERIAL NO

17864309

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thermally-conductive structural adhesive for new energy power batteries, including: composition A including 3.3-14 wt. % of a block polymerized telechelic carboxyl compound and/or a block polymerized telechelic amino compound; 0.1-1.0 wt. % of a coupling agent and/or a modifier; 0-1.6 wt. % of curing accelerator; 84-92 wt. % of a thermally-conductive powder; and 0.3-3.0 wt. % of a flame retardant agent; and composition B including 3.3-14 wt. % of a block polymerized telechelic isocyanate compound and/or a block polymerized telechelic epoxy compound; 0-1.0 wt. % of a coupling agent and/or a modifier; 0-1.6 wt. % of a curing accelerator; 84-92 wt. % of a thermally-conductive powder; and 0.3-3 wt. % of a flame retardant agent. The composition A and the composition B are mixed evenly in a weight or volume ratio of 1:(0.25-2) and cured to obtain the thermally-conductive structural adhesive. A preparation of the thermally-conductive structural adhesive is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN GOLDLINK TONGDA ELECTRONICS CO LTDRM 616-619 HUAFENG XIN'AN COMMERCIAL BLDG DIST NO 45 BAO'AN SHENZHEN GUANGDONG 518101

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shore, Yorway Shenzhen, CN 2 0
Tan, Youyu Shenzhen, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00