Refined cereal-based beverages

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12031114
APP PUB NO 20220389353A1
SERIAL NO

17828247

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to methods for preparing cereal-based beverages. Particularly, the present invention provides, for example, methods for steeping and germination of cereal grain under continuous aeration. The present invention also provides for wet milling of germinated cereal grains and direct transfer of the germinated grain, without drying, to the brewery for further processing. Compared to current methods the methods of the present invention significantly reduces water consumption, energy consumption and transport need.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CALSBERG BREWERIES A/SNY CARLSBERG VEJ 100 COPENHAGEN V 1799

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Knudsen, Søren Malov, DK 14 8
Krucewicz, Katarzyna Soborg, DK 4 0
Lok, Finn Valby, DK 14 47
Marri, Lucia Frederiksberg, DK 5 0
Olsen, Ole Copenhagen S, DK 83 753
Skadhauge, Birgitte Birkerod, DK 17 40
Wendt, Toni Frederiksberg, DK 10 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 9, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00