Mesophase pitch for carbon fiber production using supercritical carbon dioxide

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11725146
APP PUB NO 20220363995A1
SERIAL NO

17874832

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of methods for improving mesophase pitch for carbon fiber production using supercritical carbon dioxide are described. The methods improve the relative amount and quality of mesophase pitch in feedstocks, such as coal tar, already having at least some mesophase pitch. One particular method includes performing a sCO2/toluene extraction on the coal tar to obtain a toluene insoluble fraction of the coal tar; mixing the toluene insoluble fraction with sCO2 to obtain a sCO2/toluene insoluble fraction mixture; and extruding the sCO2/toluene insoluble fraction mixture, thereby separating the sCO2 from the toluene insoluble fraction to obtain fibers of mesophase pitch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TERRAPOWER, LLC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goodrich, Benjamin L Marysville, US 6 34
Kim, Pyoungchung Bothell, US 6 13
Targett, Matthew Bainbridge Island, US 28 86
Walter, Joshua C Kirkland, US 79 487

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 15, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00