Systems and methods for predictive load response

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11522478
APP PUB NO 20220360202A1
SERIAL NO

17300300

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for regulating transient deviations in an output voltage of a power generator system are provided. An automatic voltage regulator (AVR) may receive a predictive load signal from a load. The predictive load signal may relate to an anticipated change in the load. The predictive load signal can be configured to include information of the anticipated change in the load. The AVR may extract the information of the anticipated change in the load from the predictive load signal, responsive to receiving the predictive load signal. The AVR may analyze the extracted information to determine whether the anticipated change causes a transient deviation above a predetermined level in the output voltage. The AVR may adjust an excitation current of an alternator prior to detecting a difference between a voltage setpoint and the output voltage, responsive to determining that the anticipated change in the load causes the transient deviation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CUMMINS POWER GENERATION INC1400 73RD AVENUE NE MINNEAPOLIS MN 55432

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Kai Columbus, US 565 3689

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00