Suction device for a textile machine, textile machine with a suction device, use of two cyclone elements, and method for suctioning yarns

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12091279
APP PUB NO 20220356038A1
SERIAL NO

17619862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A suction device (100) for a textile machine comprising a mouthpiece (2) for introducing at least one yarn, a suction pipe (3) for guiding the yarn and a suction element (5) for generating a suction pressure. The suction element (5) comprises at least two cyclone elements (1a, 1b) for generating a vortex flow of compressed air. The cyclone elements (1a, 1b) are arranged one behind the other in the suction direction (A), so that a yarn can be passed first through a first cyclone element (1a) and then through a second cyclone element (1b). Each cyclone element (1a, 1b) comprises a cyclone axis, the cyclone axes being aligned in particular coaxially. Each cyclone element (1a, 1b) comprises at least one opening (31a, 31b) at the periphery, which is connected to a preferably common air delivery system (12), in particular in such a way that vortexes in both cyclone elements (1a, 1b) have the same direction of rotation. The suction device (100) comprises in particular a Laval nozzle (13).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEBERLEIN TECHNOLOGY AGWATTWIL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brunner, Andreas Wuppenau, CH 39 113
Buchmuller, Patrick Krummenau, CH 6 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00