Apparatus for temporal scheduling of a load to be transported

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11829937
APP PUB NO 20220343276A1
SERIAL NO

17744641

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus is provided for improved processing of instructions to provide temporal selection to a client when scheduling a load to be transported for a prospective transportation industry customer. The apparatus includes a processor and a non-transitory machine readable memory. The processor is designed to process instructions to provide date and time selection to a client from a server to enable temporal scheduling of a load to be transported for a prospective transportation industry customer. The non-transitory machine readable memory at a host server has stored therein computer instructions programmed to cause the processor to store and access user information and instructions, and to present, enable, receive, store and associate date ranges, time ranges and waypoints for a load and cargo delivery destination. A method is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FREIGHTMONSTER COM INCHAMILTON MT

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Arlen Corvallis, US 30 974
Lockhart,, Jr Larry C Hamilton, US 3 1
Wilson, Matt Hamilton, US 15 314

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00