Tool for producing an arrangement composed of an electrical line and contact device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11876330
APP PUB NO 20220336969A1
SERIAL NO

17720870

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tool for producing an arrangement composed of an electrical line and a contact device with a crimp sleeve includes a first press jaw unit and a guide unit. The first press jaw unit delimits a tool receptacle and receives the crimp sleeve and the electrical line. The first press jaw unit has a first press jaw with a first press surface and a second press jaw with a second press surface. The second press surface is adjustable between a first press position positioned radially inwardly and a second press position. The guide unit provides a first pressing force transmitted into the first press surface and from the first press jaw to the second press jaw. The first press surface stamps a first stamped indentation and the second press surface stamps a second stamped indentation into the crimp sleeve to crimp the crimp sleeve on the electrical line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TE CONNECTIVITY GERMANY GMBHGERMAN BENSHEIM BENSHEIM HESSIAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bluemmel, Uwe Bensheim, DE 23 113

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00