Integrated power pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11702937
APP PUB NO 20220333487A1
SERIAL NO

17235179

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pump includes a housing, a process stream input, a process stream output, a power stream inlet, and a rotor. The rotor comprises an impeller, a shroud, and a turbine. The impeller comprises fluid motive elements positioned about a central axis of the rotor and extending outward to the shroud. The turbine comprises runners formed on an outwardly facing surface of the shroud of the rotor. The shroud extends radially about the fluid motive elements of the impeller. The rotor is rotatably supported within the housing. The runners cause the rotor to rotate when the power stream flows through a fluid path impinging the runners thereby transferring energy from the flow of the power stream received through a power stream inlet into rotational energy of the fluid motive elements of the impeller to propel the process stream from a process stream input out a process stream output.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANYP O BOX 5000 DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
AlOdan, Nabeel M Dhahran, SA 1 0
Dhafiri, Amer A Dammam, SA 1 0
Farooqi, Rehan Rancho Cucamonga, US 2 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00