Cable assembly and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11581110
APP PUB NO 20220328214A1
SERIAL NO

17497531

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cable having a transmission wire, a first metal covering layer, an inner insulating layer, a second metal covering layer, an outer insulating layer, an insulating protective layer, and an outer metal layer and method of making such. The transmission wire, a first metal covering layer , and inner insulating layer extend along a first direction, wherein the first metal covering layer and inner insulating layer cover the transmission wire. The first metal covering layer comprises a first axial end part. The inner insulating layer comprises a second axial end part. The second metal covering layer extends along the first direction and covers the inner insulating layer. The second metal covering layer comprises a third axial end part. The outer insulating layer extends along the first direction and covers the second metal covering layer. The outer insulating layer comprises a fourth axial end part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LANTO ELECTRONIC LIMITEDNO 399 BAISHENG ROAD JINXI TOWN KUNSHAN CITY JIANGSU PROVINCE 215324

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kong, WeiChuang Kunshan, CN 1 0
Zhang, XianSheng Kunshan, CN 17 23
Zhou, Yi Kunshan, CN 360 1976

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 14, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00