Gasification apparatus with controller for negative pressure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11781080
APP PUB NO 20220290063A1
SERIAL NO

17635865

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gasification apparatus has a primary chamber with a floor comprising a hearth and feedstock augers, for gasification of feedstock. There is a mixing chamber for receiving through an opening synthetic gases from the primary chamber and comprising an air inlet fan for adding oxygen for ignition. There is also a secondary chamber linked with the mixing chamber to deliver heat from combustion of gases from the mixing chamber to the hearth. An outlet valve delivers gases from the secondary chamber through a heat exchanger and to an induce draft fan. A controller dynamically controls flow of gases in the chambers according to sensed pressures and temperatures in said chambers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AGS ENERGY (IRELAND) LIMITEDNSC BUILDING LOUGHMAHON TECHNOLOGY PARK MAHON CORK

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McNamara, Edward Cork, IE 31 5375

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00