Semiconductor device with epitaxial liftoff layers for directly converting radioisotope emissions into electrical power

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11783956
APP PUB NO 20220262534A1
SERIAL NO

17549724

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for producing electricity. In one embodiment, the device comprises a doped germanium or a doped GaAs substrate and a plurality of stacked material layers (some of which are doped) above the substrate. These stacked material layers, which capture beta particles and generate electrical current, may include, in various embodiments, GaAs, InAlP, InGaP, InAlGaP, AlGaAs, and other semiconductor materials. A radioisotope source generates beta particles that impinge the stack, create electron-hole pairs, and thereby generate electrical current. In another embodiment the device comprises a plurality of epi-liftoff layers and a backing support material. The devices can be connected in series or parallel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CITY LABS INC12491 SW 134TH COURT SUITE 23 MIAMI FL 33186

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cabauy, Peter Miami, US 23 136

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00