System and method for ice manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11692753
APP PUB NO 20220243971A1
SERIAL NO

17727616

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for manufacturing clear ice products is provided. The system includes a freezing module, a demolding module, and a converting station. The freezing module includes a frame comprising a plurality of levels, a plate freezer provided at each level, and at least one mold provided for placement on each plate freezer and suitable for receiving water. A control frame is provided associated with each plate freezer and is movable from an elevated position to fill position. In the fill position, the control frame is at least partially disposed within the mold. One or more circulation pumps are associated with each control frame for circulating water in the mold to release air bubbles as the water freezes. The demolding module removes the mold from the freezing module and removes formed ice from the mold. The converting station converts the formed ice into a clear ice product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MINNESOTA ICE SCULPTURES L L C755 PRIOR AVE SUITE 237 ST PAUL MN 55104

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harrell, Robert E St. Paul, US 7 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00