Cellulose-based structural flooring panel assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12065829
APP PUB NO 20220243470A1
SERIAL NO

17614363

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cellulose-based structural building panel assembly includes a cross-laminated timber (CLT) core which is reinforced with one or more post-tensioned tendons stressed to a pre-selected tensioning force, following the placement as part of the panel assembly. The tendons are provided within a sleeve which is grouted with a channel formed in an underside of the core and which after post-tensioning of tendons is infilled with a binder securing the tendons in a fully bonded configuration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DIALOG IP CORP35 JOHN STREET SUITE 500 TORONTO M5V3G6

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Applegath, Craig Toronto, CA 1 0
Khachi, Daria Toronto, CA 1 0
Wu, Thomas Vancouver, CA 31 378

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00