Multi-tube combustor and gas turbine including same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11680708
APP PUB NO 20220228745A1
SERIAL NO

17540242

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-tube combustor is provided. The multi-tube combustor includes a plurality of fuel nozzles disposed in a nozzle tube provided inside a nozzle casing, each fuel nozzle having a cavity, a plurality of compressed air supply tubes connected to the plurality of fuel nozzles and configured to supply a compressed air to the plurality of fuel nozzles, and an on/off valve provided on the plurality of compressed air supply tubes to open and close the compressed air supply tubes. The fuel and the compressed air are mixed inside the plurality of fuel nozzles, and the plurality of fuel nozzles are divided into a plurality of fuel nozzle groups, and a mixture of the fuel and the compressed air is ejected from one or more selected fuel nozzle groups of the plurality of fuel nozzle groups according to a combustion load condition or during a ramp-up process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTD22 DOOSANVOLVO-RO SEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51711

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Seok, Jung Min Gimhae, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00