Rainwater Collection Assembly
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
N/A
Issued Date -
Jun 30, 2022
app pub date -
Dec 31, 2020
filing date -
Dec 31, 2020
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A rainwater collection assembly for collecting rainwater includes a reservoir that is mountable to a wall of a building and the reservoir has an inlet that is in fluid communication with a downspout of a gutter system of the building to direct rainwater into the reservoir for storage. The reservoir has a pair of outlets each being integrated therein to release the rainwater from the reservoir. A spigot is fluidly integrated into the reservoir to release the rainwater from the reservoir when the spigot is opened. An intake pipe is fluidly coupled to the inlet in the reservoir and the intake pipe can be fluidly coupled to a downspout of the gutter system for directing the rainwater into the reservoir.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
PACIOR CASIMIR | OIL CITY PA |
International Classification(s)

- 2020 Application Filing Year
- E03B Class
- 186 Applications Filed
- 127 Patents Issued To-Date
- 68.28 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Pacior, Casimir | Oil City, US | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- E03B Class
- 0 % this patent is cited more than
- 3 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Dec 30, 2025 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Dec 30, 2029 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 30, 2033 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
