DEVICE UNDER TEST SYNCHRONIZATION WITH AUTOMATED TEST EQUIPMENT CHECK CYCLE

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20220155370A1
SERIAL NO

17455237

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems, integrated circuits and methods for synchronizing testing a Device under test (DUT) with an automated test equipment (ATE) is provided. In one example, a method includes transmitting a test packet from an ATE to a first Device Under Test DUT; receiving, at the ATE from the DUT, a result packet; and in response to receiving a Start of Packet (SOP) indicator from the DUT at the ATE, evaluating the first DUT by comparing the result packet to an expected packet associated with the test packet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYNOPSYS INCORPORATED690 EAST MIDDLEFIELD ROAD MOUNTAIN VIEW CA 94043

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
HU, Yongkang Xi'an, CN 5 8
KOLISETTI, Ramalingam Karempudi, IN 3 3
SAMUDRA, Abhijeet Santa Clara, US 3 0
SINHA, Anubhav Hyderabad, IN 11 105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation