Method of dicing a semiconductor substrate having a scribe lane defined therein

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11710706
APP PUB NO 20210366837A1
SERIAL NO

17397614

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device includes a semiconductor substrate having a scribe lane defined therein. A plurality of semiconductor chips is formed on an upper surface of the semiconductor substrate. At least one conductive structure is arranged on an upper surface of the semiconductor substrate, within the scribe lane thereof. A fillet is arranged on at least one side surface of the conductive structure. The fillet is configured to induce a cut line which spreads along the scribe lane, through a central portion of the conductive structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTD129 SAMSUNG-RO YEONGTONG-GU SUWON-SI GYEONGGI-DO 16677

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bae, Byung-Moon Daegu, KR 5 12
Kim, Yoon-Sung Seoul, KR 6 12
Kim, Yun-Hee Hwaseong-si, KR 75 907
Sim, Hyun-Su Cheonan-si, KR 5 12
Yoon, Jun-Ho Seoul, KR 18 123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00