Integrated circuit including standard cells, and method of fabricating the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11664365
APP PUB NO 20210358902A1
SERIAL NO

17241510

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated circuit according to some example embodiments of inventive concepts includes a substrate including a well including dopants of a first conductivity type, a first device region on the well, the first device region extending in a first direction parallel to the substrate, and a first isolation element inside the well, the first isolation element extending in the first direction. The first isolation element includes a first power rail configured to receive a power source voltage, and a first doping region between the first power rail and the well, the first doping region configured to transfer the power source voltage from the first power rail to the well, and including dopants of the first conductivity type.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kang, Heewon Hwaseong-si, KR 17 262
Kim, Minsu Hwaseong-si, KR 188 494

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 30, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00