Method of blasting using jet units charged in a blast-hole

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11719516
APP PUB NO 20210356239A1
SERIAL NO

17287191

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Liners (150), fittings (11-22), and spacers (23-25) are provided to assemble the jet (170) units, which work as explosives (110) and detonators (120) to form stand-off distance and air-deck (140) space. The liners (150) release jets (170) and the fittings (11-22) and spacers (23-25) are designed to attach the liner (150) firmly to the explosives (110), inducing the cavity effect. The objective of the present invention is to provide a blasting method using a jet (170) unit to overcome the limits of sympathetic detonation, applying a mechanism that is ideal according to the analysis of observations in blast-hole (100) blasting. The application of jet (170) units for jet (170) detonation in blast-hole (100) blasting overcomes the performance limits of explosives (110) manufacturing and the conceptual limits of detonators (120) functionalities and improves the channel effect, dead pressing, loss of power, and stopping of detonation etc. Particularly, the application of controlled blasting and air-decking can be carried out without restriction while maintaining the safety of the slurry or emulsion explosives (110).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KWON MOON JONGNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kwon, Moon-Jong Busan, KR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 8, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00