Method of rapid treatment of heavy metal sludge and preparation of ferrite magnets

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11524904
APP PUB NO 20210354996A1
SERIAL NO

17313025

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of rapid treatment of heavy metal sludge and preparation of ferrite magnets comprises following steps of: providing a sludge, the sludge at least having zinc metal and ferrous metal; adding an iron-containing substance to the sludge; pickling the sludge and the iron-containing substance with sulfuric acid to obtain a pickling solution with zinc ions and iron ions; neutralizing the pickling solution with sodium hydroxide to form hydroxide precipitates; and airing and heating the neutralized pickling solution by an ultrasonic-microwave method so that the hydroxide precipitates undergoing a ferrite magnet reaction, thereby obtaining ferrite magnets with a spathic structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KUN SHAN UNIVERSITYNO 195 KUN-DA RD YUNG-KANG DISTRICT TAINAN CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Anna Tainan, TW 1 0
Hsiao, Ming-Chien Tainan, TW 4 6
Hsiao, Po-Han Tainan, TW 2 0
Lan, Vu Nguyen (Hcmute) Tainan, TW 1 0
Sheu, Hwey-Lin Tainan, TW 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00