Method for controlling a power supply device of an electrical system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11811257
APP PUB NO 20210351606A1
SERIAL NO

17272044

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling a power supply device of an electrical system, the device including at least one separate power supply assembly per phase of the electrical system, each power supply assembly including at least one battery pack defined by a state parameter and provided with at least one battery to supply a control voltage to the phase to which it is connected, taking into account at least one setpoint value. The method includes executing at least one correction block receiving as input each setpoint value and the state parameter of each battery pack of the power supply assemblies of the system, and for each power supply assembly, the correction block is configured to determine a correction value to be applied directly or indirectly to its setpoint value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES25 RUE LEBLANC BAT LE PONANT 75015 PARIS 75015

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bacquet, Sylvain Grenoble, FR 24 77
Cassarino, Leandro Grenoble, FR 6 2
Despesse, Ghislain Grenoble, FR 80 597
Fernandez, Eric Grenoble, FR 25 64
Lopez, Yan Grenoble, FR 12 13
Thomas, Remy Grenoble, FR 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00