Shaped charge load tube with integrated detonation cord retention mechanism

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11834935
APP PUB NO 20210348486A1
SERIAL NO

17315922

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A loading tube is configured to receive one or more shaped charges to form a perforating gun. The loading tube includes a tubular body extending along a longitudinal axis; a cord passage formed into the tubular body; a retention cutoff formed into the tubular body and configured to receive a detonator cord; and a holding element extending into the retention cutoff and being integrally made with a wall of the tubular body, wherein the holding element is configured to hold the detonator cord into the retention cutoff. The cord passage is configured to receive the detonator cord from a bore of the tubular body and to direct the detonator cord outside the bore of the tubular body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GEODYNAMICS INCMILLSAP TX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rollins, James A Lipan, US 33 590
Yang, Wenbo Kennedale, US 81 1322

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00