Apparatus, methods and systems for improving coverage of fifth generation (5G) communication networks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11818590
APP PUB NO 20210328353A1
SERIAL NO

17233142

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In some embodiments, a system includes a first antenna element configured, in response to receiving fifth generation (5G) communication signals carrying encoded data, to generate a first surface electromagnetic wave. The first surface electromagnetic wave is capable of tunneling through a conductive enclosure and includes the encoded data. The system includes a second antenna element, within the conductive enclosure configured, in response to receiving the first surface electromagnetic wave, to generate a second surface electromagnetic wave within the conductive enclosure for distributing the encoded data to an electronic device operating in the conductive enclosure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SALTENNA LLC1751 PINNACLE DR MCLEAN VA 22102

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balzano, Quirino Annapolis, US 34 1626
Smolyaninov, Igor Columbia, US 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00