Oilfield deep well processing and injection facility and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11911732
APP PUB NO 20210308637A1
SERIAL NO

16839366

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for processing one or more waste fluids by measuring one or more properties of a waste fluid and adjusting the flow and/or flowability of the waste fluid based on the measurement are disclosed. The one or more properties of the waste fluid can include a viscosity of the waste fluid, a pressure of the waste fluid, and/or or a difference in pressure of the waste fluid. Adjusting the flow and/or flowability of the waste fluid can include adjusting the one or more properties of the waste fluid and/or affecting the direction of flow of the waste fluid in a manner which changes the destination of the waste fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUBLU INNOVATIONS LLC1008 SOUTHVIEW CIRCLE CENTER TX 75935

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harman,, Jr Robert Meredith Sugar Grove, US 10 6
Vemulapalli, Ravi Sudhakar Katy, US 10 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00