Electric compressor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11811286
APP PUB NO 20210305873A1
SERIAL NO

17206662

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric compressor includes a housing, an electric motor, and an inverter. The housing includes a motor chamber. The electric motor includes a stator that includes a stator core, a plurality of first coils, a plurality of second coils, and a plurality of third coils. The first coils are connected in series, the second coils are connected in series, and the third coils are connected in series. One of the first coils that is located electrically closest to the first phase is referred to as a first specific coil, one of the second coils that is located electrically closest to the second phase is referred to as a second specific coil, and one of the third coils that is located electrically closest to the third phase is referred to as a third specific coil. The first to third specific coils are disposed above the shaft center of the drive shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOYOTA JIDOSHOKKI2-1 TOYODA-CHO KARIYA-SHI AICHI 4488671 ?4488671

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adaniya, Taku Aichi-ken, JP 107 728
Ikai, Kensuke Aichi-ken, JP 7 28
Sugimoto, Wataru Aichi-ken, JP 12 95
Takimoto, Shuji Aichi-ken, JP 13 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00