Ignition coil

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11430604
APP PUB NO 20210287850A1
SERIAL NO

16338768

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ignition coil includes: a center core; a primary coil wound around the center core; a secondary coil wound around the primary coil; a plurality of side cores, which are arranged around the secondary coil, and are coupled to the center core to form a closed magnetic path; a magnet inserted between the plurality of side cores; an igniter configured to control supply and interruption of a current to the primary coil; a case configured to accommodate the center core, the primary coil, the secondary coil, the plurality of side cores, the magnet, and the igniter; and insulating resin filled in the case. The side cores include a wide portion and a narrow portion. The magnet is inserted into the wide portion. The igniter is arranged between the narrow portion and the case.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION2-2-3 MARUNOUCHI CHYODA-KU TOKYO 100-8310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Idogawa, Takashi Tokyo, JP 19 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00