Process for separating carbon dioxide and argon from hydrocarbons

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11453653
APP PUB NO 20210284616A1
SERIAL NO

17259979

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for producing ethylene oxide (EO) are disclosed. Ethylene oxide is produced by direct oxidizing ethylene with oxygen in a reactor. The effluent from the reactor is processed to produce (a) a product stream comprising water and ethylene oxide, (b) a reabsorber overhead stream comprising ethylene, methane, argon, and carbon dioxide, and (c) a carbonate flash gas stream comprising carbon dioxide, ethylene, methane, and water. The reabsorber overhead stream and the carbonate flash gas stream are combined to form a reclaim gas stream. The reclaimed gas stream is separated in a membrane separation unit to remove carbon dioxide and argon, forming a recycle stream comprising primarily ethylene and methane, collectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SABIC GLOBAL TECHNOLOGIES B VPLASTICSLAAN 1 BERGEN OP ZOOM 4612 PX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duan, Jintang Riyadh, SA 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00