Pre-assembled gas plumbing system and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11525546
APP PUB NO 20210278049A1
SERIAL NO

17195902

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates generally to natural gas plumbing systems. More specifically, the present invention relates to a plumbing system that is preassembled to a large extent at a manufacturing site prior to shipping to the site of installation. The pre-assembled plumbing system may be used to convey gas to, for example, a fire pit, outdoor gas grill, fire bowl, gas lighting, and fire tables. The pre-assembled plumbing system may be easily installed and may include a flexible gas pipe, a transition riser, and a lead-in assembly. Further, the lead-in assembly may include a swivel joint configured to provide 360 degrees of multi-plane range of motion. The plumbing system may be coiled for storage and then transported to a site. Advantageously, the plumbing system is manufactured and sold as a single pre-assembled unit, thereby facilitating the ease and speed with which the plumbing system can be installed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHICAGO GAS LINES INC1118 W MARION RD ARLINGTON HEIGHTS IL 60004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gerstad, Ryan McHenry, US 1 0
Selleck, Edward Arlington Heights, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00