Truck trailer with deck-level and curb-level unloading capability and additional cubic capacity

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11654814
APP PUB NO 20210261031A1
SERIAL NO

17181186

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A trailer includes a front section having a first floor with an upper surface at a fixed vertical level approximately between three and six feet above a street level, a middle section, and a rear section having a second floor with an upper surface at the fixed vertical level. A horizontally-oriented platform is disposed in the middle section. A lifting mechanism is coupled to the platform and selectively raises and lowers the platform between a lower position of one to two feet above street level, otherwise known as curb-level, and an upper position of approximately between three and seven feet above street level.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STRICK TRAILERS LLC225 LINCOLN HIGHWAY FAIRLESS HILLS PA 19030

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bell, Justin New Haven, US 6 5
Palmer, Michael W Glenn Allen, US 3 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00