Impedance converter and electronic device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11688916
APP PUB NO 20210249745A1
SERIAL NO

17143195

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An impedance converter includes an insulating layer; a first wire provided on a first surface of the insulating layer and extending in a first direction; a second wire provided on a second surface of the insulating layer and extending in the first direction and face the first wire, the second surface being located on a side opposite to the first surface; a third wire provided on the first surface and extending in a second direction orthogonal to the first direction; a fourth wire provided on the second surface and extending in the second direction and face the third wire; a fifth wire provided on the first surface and extending in the second direction; and a sixth wire provided on the second surface and extending in the second direction and face the fifth wire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJITSU LIMITED1-1 KAMIKODANAKA 4-CHOME NAKAHARA-KU KAWASAKI-SHI KANAGAWA 211-8588

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Niida, Yoshitaka Atsugi, JP 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00