Bogie and rail vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11590991
APP PUB NO 20210237782A1
SERIAL NO

17053470

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bogie and a rail vehicle, wherein the bogie includes: a framework, a wheel pair connected to the framework, a braking hanger fixed to the framework, a hanger slider used for fixedly connecting to a vehicle wheel braking clamp, and a transmission member; the hanger slider is connected to the braking hanger, and the transmission member is connected to the hanger slider; a first end of the transmission member extends to a side surface of a vehicle wheel in the wheel pair, and the transmission member is used to drive the hanger slider to move along the lateral direction with respect to the braking hanger when the first end is subjected to a thrust applied in the lateral direction by the vehicle wheel, so that the vehicle wheel braking clamp moves to a position corresponding to the vehicle wheel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CRRC TANGSHAN CO LTD063035 NO 3 FRONT ROAD FENGRUN DISTRICT HEBEI TANGSHAN CITY TANGSHAN CITY HEBEI PROVINCE 063035

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jing, Hongwei Tangshan, CN 1 0
Li, Chao Tangshan, CN 578 2383
Ma, Chuan Tangshan, CN 18 7
Xu, Hongjiang Tangshan, CN 43 30
Zhang, Lixin Tangshan, CN 168 2390
Zhang, Yunlong Tangshan, CN 101 2183
Zheng, Guangsheng Tangshan, CN 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00