Volumetric control for proppant concentration in hydraulic fracturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11896940
APP PUB NO 20210229049A1
SERIAL NO

16972122

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for controlling proppant concentration in a hydraulic fracturing slurry include measuring volumetric flow rates of fracturing fluid input to a blender and hydraulic fracturing slurry output from the blender, using these measured values to calculate a volumetric flow rate of proppant input, a slurry density and/or a slurry volume fraction, adjusting first and second valves to control rates of fluid and proppant delivery to the blender and re-measuring the volumetric flow rates and recalculating until target values of volumetric flow rate of proppant input, slurry density and/or slurry volume fraction are achieved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fripp, Michael Linley Carrollton, US 369 2820
Mazrooee, Mehdi Double Oak, US 18 187

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00