Power supply system, server, and power generation facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11380915
APP PUB NO 20210218042A1
SERIAL NO

17142340

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply system includes a power generation facility configured to supply power to a consumer and a server configured to communicate with the facility. The facility includes a fuel cell configured to generate, using fuel gas supplied via a supply path of the fuel gas to the consumer, power to be supplied to the consumer, and a measurement unit configured to measure a supply amount of the fuel gas used for the power generation. The server includes an acquisition unit configured to acquire information concerning a supply amount of the fuel gas supplied to the consumer, and a specifying unit configured to specify, based on a measurement result of the measurement unit received from the facility and the information, a supply amount of the fuel gas not used for the power generation in the supply amount of the fuel gas supplied to the consumer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDJAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shinohara, Masashi Wako, JP 18 161
Tsukamoto, Keiji Wako, JP 17 244

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 5, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00