Boat lift construct
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Sep 5, 2023
Grant Date -
Jul 15, 2021
app pub date -
Mar 29, 2021
filing date -
May 23, 2019
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A boat lift is attached to piles driven into the earth or to another object. The boat lift is held in horizontal position relative to piles or the object to which it is attached, but vertical movement of the boat lift relative to the object is permitted. The boat lift is connected to the piles by modular units or cube constructs that have a post extending there through. The post has a blade extending from it. The blades are attached at an angle, according to the application, to pile guides that engage piles. The pile guides vertically traverse the piles, permitting the boat lift to move vertically relative to the object, but fixing the horizontal position of the boat lift.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
BARNES SEAN A | MT PLEASANT SC |
International Classification(s)

- 2021 Application Filing Year
- B63C Class
- 162 Applications Filed
- 91 Patents Issued To-Date
- 56.18 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Barnes, Sean A | Mt. Pleasant, US | 24 | 205 |
# of filed Patents : 24 Total Citations : 205 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- B63C Class
- 88.46 % this patent is cited more than
- 2 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Mar 5, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Mar 5, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Mar 5, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
