BUS BAR COMPRISING FUSE APPLIED THEREON
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Jun 24, 2021
app pub date -
Feb 12, 2020
filing date -
Feb 12, 2020
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The present disclosure provides a busbar to which a fuse has been applied including a busbar body for electrically connecting cells of a plurality of batteries, at least one fuse for electrically connecting power supplied from the outside through an independent connection part for each cell of the battery through the busbar body, and formed on the busbar body, and a resin part formed on at least a portion of the fuse.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
DAE SAN ELECTRONICS CO LTD | 60 HWASEONG-RO 1616 BEON-GIL BIBONG-MYEON HWASEONG-SI GYEONGGI-DO 18284 |
International Classification(s)

- 2020 Application Filing Year
- H01M Class
- 7558 Applications Filed
- 4012 Patents Issued To-Date
- 53.09 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Ma, Sangyoung | Ansan-si, KR | 4 | 2 |
# of filed Patents : 4 Total Citations : 2 | |||
Yeo, Un Eog | Ansan-si, KR | 3 | 3 |
# of filed Patents : 3 Total Citations : 3 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H01M Class
- 0 % this patent is cited more than
- 4 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Dec 24, 2024 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Dec 24, 2028 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 24, 2032 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
